what were the long term responses of the Boscastle 2004 flood?

SMITH SHELLY

River was made deeper and wider to let more water through
The surrounding area and car park were raised
A bridge and other buildings were replaced - I assume that the design and construction were specifically to chosen in the light of this potentially happening again.
More stations where water flow was measured were set up

Tabitha Farrant